Structural steel & fabrication contractors
Steel project control, from tonnage ordered to steel erected.
Structural work runs on tonnes, member marks and drawing revisions. TraceGrid tracks material from the mill order through fabrication and erection, and prices every change to the drawings before it costs you.
The pressure you work under
Tonnes on paper, steel in the yard.
Material ordered against an old revision
Drawings change after the order goes out. Without original and revised quantities side by side, the yard ends up short on one section and long on another.
Fabrication progress nobody can see
The shop knows what is cut, drilled and painted. Site and the client only find out when a load arrives, or does not.
Erection waiting on the last few pieces
A missing brace or cleat holds up a whole bay. Finding out on the day costs crane hours and crew time.
Variations priced long after the steel went up
Extra platforms, revised connections and site modifications get built first and argued later, usually at a discount.
How TraceGrid helps
One record from mill order to final bolt.
- 1
Set up the job by tonnage and mark
Import the steel schedule as a BOQ with sections, marks and tonnes, and keep the client's numbering.
- 2
Buy sections and plate against what is needed
RFQs follow the unordered tonnage per section. Lead times are checked against erection dates, and late orders are flagged early.
- 3
Follow the steel from shop to site
Received, fabricated and erected tonnes are captured as the work moves from the yard to site, so the office, the site and the client see the same picture.
- 4
Price the change before you build it
Each drawing change becomes a variation with its tonnage and value previewed, approved and carried through to the claim.
Modules that matter most
Where to start for structural steel & fabrication.
- Estimating Rate build-ups per tonne, and the winning quote converted straight into the project BOQ. R650 per month
- Procurement Order sections and plate against outstanding tonnage, with lead times checked against erection. R550 per month
- Core Original and revised quantities per mark, and variations approved before the work starts. R1,400 per month
- Progress Claims Monthly valuations from erected tonnage, with retention held and released per contract. R450 per month
Every module includes unlimited users. Core is required; add the others as you need them.
See it with your own projects
See your steel schedule as a live project.
Explore the interactive demo, or email us a steel schedule from a recent job and we will show it to you in TraceGrid.