Built for South African industrial contractors

Every quantity, from BOQ to site, traced.

TraceGrid runs your BOQs, supplier quotes, purchase orders, deliveries and progress in one system. Each detail is captured once, by the person closest to it, and every later stage builds on it. Nobody types the same quantity twice.

Try the interactive demo
  • Unlimited users
  • Hosted in South Africa
  • From R1,400 per month
TraceGrid Overview for a boiler house shutdown: contract value, earned value, the shutdown day strip and a Needs your attention list with an overdue delivery.
The interactive demo, with fictional data.
  • BOQ import
  • Variations
  • RFQs
  • Quote comparison
  • Purchase orders
  • Partial deliveries
  • Progress
  • Daily reports
  • Planning
  • Traceability
  • Site mode
  • Exports

The problem

The same details, captured five times.

The BOQ lives in a spreadsheet, quotes arrive by email, the order is typed into accounting and the delivery note sits in the site office. Every step retypes what the one before it already knew.

  1. Copy 1

    BOQ spreadsheet

    KPW-U14-BOQ-R2.xlsx

    2.02 · 6" Sch 40 pipe · 156 m

    The original

  2. Copy 2

    Quote emails

    RE: RFQ pipe, urgent

    6in sch40 pipe x 165m

    Digits swapped: 165 m

  3. Copy 3

    Purchase order

    Typed into accounting

    150NB S40 SMLS pipe, 156 m

    Retyped by hand

  4. Copy 4

    Delivery note

    Paper copy, gate 3

    Pipe 6", qty 7

    Unit lost: 7 of what?

  5. Copy 5

    Progress report

    Rebuilt every Friday

    Piping 2.02 · about 60%?

    Retyped by hand

Errors creep in

156 m becomes 165 m in an email. Nobody notices until the pipe runs short on site.

People chase paper

Buyers, storemen and QSs spend their days phoning around to find out what was ordered, what arrived and what was installed.

Material arrives late

On a shutdown, a missing spool discovered on the morning of the tie-in can cost you the window.

See it working

Capture once, carry it forward.

Each detail is entered once, by the person closest to it, and every later stage picks it up. These are the real screens, from the interactive demo.

  1. The bill of quantities: every line with its original and revised quantity, ordered, delivered, installed and progress.

    01

    BOQ

    Import the client's BOQ from Excel. Every line gets a home and a history.

  2. Quote comparison for the variation materials: three suppliers side by side, with the cheapest valve flagged as arriving too late.

    02

    Quotations

    RFQs for what is not yet ordered, and supplier quotes compared on price and on time.

  3. Raise PO, pre-filled from the award: lines, quantities, prices and lead times, each with a chip showing where it came from.

    03

    Purchase orders

    Award line by line. The PO carries the BOQ reference, price and lead time.

  4. Capture goods received, pre-filled with what is outstanding on the purchase order, with a chip showing the source.

    04

    Deliveries

    Received against the PO at the gate, with partials and rejections recorded.

  5. Progress: installed quantities per BOQ line, limited to material that is actually on site.

    05

    Progress

    Installed quantities, limited to material that is actually on site.

  6. Documents: every quote, order, delivery note and report filed against the record it belongs to.

    06

    Reporting

    Daily reports, client updates and exports assemble themselves.

What changes

Less admin. More work delivered.

  • Deliver more work with the same team

    When nobody retypes quantities or hunts for paperwork, your buyers, QSs and planners get hours back every week for the work that pays.

  • Protect your margin

    Ordered, delivered and installed sit next to the BOQ on every line, so over-ordering and unclaimed extras show up while you can still act.

  • Keep shutdowns on schedule

    See which activities are waiting on material days before the window opens, while there is still time to expedite.

  • Get paid for every change

    Variations are captured with their quantity impact and client approval, so every VO finds its way onto the claim.

  • Answer client questions immediately

    Where is the 6 inch pipe? How much is installed? The answer is one click away, with the delivery note attached.

  • Win the next tender

    Price new work from the rates and quantities of jobs you have already run, and turn the winning quote straight into the BOQ.

Inside TraceGrid

Built around the way site work really runs.

Short, silent clips from the interactive demo. Every number in them is carried forward, never retyped.

Procurement

Purchase orders nobody has to type.

Quotes line up against the same BOQ quantities, with a warning when the cheapest arrives too late. Award line by line and the PO fills itself in.

  • RFQs only for quantities not yet ordered
  • Approval limits on purchase orders
See it in the full tour (about 11 minutes)
Raise PO: the pre-filled draft purchase order is created from the award in one click.

Deliveries

Short and rejected, both on record.

Site receives against the PO at the gate. What arrived, what was rejected and why are captured once, and what is still owed stays open on the order.

  • Pre-filled with what is outstanding
  • Photos of the delivery note, from a phone
See it in the full tour (about 11 minutes)
Capturing goods received: the delivery note, quantity received and a rejection with its reason.

Estimating

The estimate you won becomes the project.

Rates built up from your price book, revisions you can compare, and a quotation written from the estimate. Mark it as won and the BOQ is already there.

  • Material, labour and plant per rate
  • Rev A against Rev B, line by line
Watch the 2 minute tour
Rev B of the estimate is marked as won and becomes a new project with its BOQ.

Progress claims

Payment claims from what was installed.

Each claim is valued from captured progress at the BOQ rates, with approved variations and retention. Record what the client certifies and hand it to accounting.

  • Previous, this claim and cumulative per line
  • A retention ledger across claims
Watch the 3 minute tour
The client's certified amount is recorded against payment claim 2, with retention worked out.

Supplier portal

Suppliers type their own prices.

Suppliers quote online and send their delivery note before the truck leaves. They only ever see what was sent to them.

  • Quotes land straight in the comparison
  • Deliveries arrive pre-filled at the gate
Watch the 3 minute tour
A supplier enters unit prices and lead times in the supplier portal and submits the quote.

Planning

Know what's ready before the crew arrives.

The shutdown programme, with material readiness worked out live from purchase orders and deliveries. When a delivery slips, the activities that need it turn red while there is still time to expedite.

The shutdown programme as a Gantt chart, with each activity marked ready, at risk or blocked from live orders and deliveries.
  • Linked to the BOQ

    Each activity knows the lines it needs, so readiness comes from orders and deliveries.

  • Blocked, with the reason

    Which line is short, by how much, and which purchase order is overdue.

  • Updates itself

    Capture a delivery at the gate and the activity turns Ready. Nobody edits the plan.

Watch the 2 minute planning tour

Modules

Start with Core. Add what you need.

Every module is priced per month in rand, with unlimited users. Switch modules on as your team is ready for them.

See full pricing
  • Required

    Core

    Projects, BOQ control, variations and the audit trail every other module builds on.

    R1,400 per month

  • Procurement

    RFQs from unordered quantities, quote comparison and approved purchase orders.

    R550 per month

  • Deliveries & Site

    GRNs at the gate, progress against material on site and frozen daily reports.

    R1,150 per month

  • Documents

    Drawings, certificates and delivery notes linked to the records they belong to.

    R650 per month

  • Planning

    Shutdown schedules and milestones that know whether the material is ready.

    R750 per month

  • Timesheets, Crews & Equipment

    Crew hours and equipment use, booked against the work they were spent on.

    R600 per month

  • Estimating

    A price book and rate build-ups. The winning quote becomes the project BOQ.

    R650 per month

  • Progress Claims

    Claims straight from captured progress, with retention tracked on every claim.

    R450 per month

  • Supplier Portal

    Suppliers quote and send delivery notes through a secure link.

    R450 per month

All nine modules: R6,650 per month, unlimited users.

Monthly prices in ZAR. No VAT is added.

Unlimited users

Give every supervisor a login. No per-user fees.

Capture once only works if the right person does the capturing. That means storemen at the gate and supervisors on the pipe rack, as well as the office. So every TraceGrid module includes unlimited users.

  • Site supervisor
  • Storeman
  • Quantity surveyor
  • Planner
  • Buyer
  • Contracts manager
  • Foreman
  • Director
  • + everyone else on site

Per-seat pricing

  • The bill grows with every person you add
  • Logins get shared, so the audit trail means little
  • The people closest to the work stay out of the system

TraceGrid

  • One monthly price per module, whatever the headcount
  • Every person gets their own login and permissions
  • Details are captured where the work happens

Security

Your project records, safe and in South Africa.

How we protect your data
  • Your data stays yours

    Export everything, any time.

  • Hosted in South Africa

    Your project data stays in the country.

  • Off-site backups

    Continuous backups, kept in Cape Town.

  • POPIA-aligned

    Personal information handled with care.

  • Permissions and audit log

    Role-based access, with every change recorded.

Founding customers

Get in early. Pay 30% less for a year.

We are opening TraceGrid to a small group of founding contractors. You get a lower price while you settle in, and a real say in what we build next.

  • 30% off every module you choose for your first 12 months
  • Shape the roadmap directly with the founder
  • Unlimited users, as on every TraceGrid plan
  • A limited number of founding places

Example: Core module

R980

R1,400 per month

For your first 12 months, then R1,400 per month. The same 30% applies to every module you add.

Users
Unlimited
Hosting
South Africa

Questions

Straight answers.

Something we haven't covered? Email [email protected] and you will hear back from the founder.

Is it hard to get our BOQs in?

No. You import the client's BOQ straight from Excel, keeping its sections, item numbers, units and quantities. From then on, variations, orders, deliveries and progress are tracked against that baseline.

Do we pay per user?

No. Every module includes unlimited users. You pay a monthly price per module, starting at R1,400 per month for Core, so you can give every supervisor, storeman and QS their own login.

Where is our data stored?

TraceGrid is hosted in South Africa, with continuous off-site backups in Cape Town. Access is controlled by role permissions, and every change is recorded in the audit log.

Can we export everything?

Yes. Reports and registers export to Excel, and your data stays yours. You can take a full export of your records at any time.

Does it replace our accounting package?

No. TraceGrid handles the project side: BOQs, procurement, deliveries, progress and claims. It exports to SMEasy and similar accounting packages, so your bookkeeping stays where it is.

Does it work on site on a phone?

Yes. Site mode, part of the Deliveries & Site module, lets storemen receive deliveries at the gate and supervisors capture progress and photos from a phone browser.

What does the founding offer include?

Founding customers get 30% off every module they choose for their first 12 months, and work directly with the founder on what TraceGrid builds next. Places are limited.

How do we start?

Try the interactive demo to see how a BOQ line moves from import to installed. Then email us to book a walkthrough, and we will take you through TraceGrid using one of your own BOQs.

Interactive demo

See it with your own eyes.

Open the demo project and follow one BOQ line from import to installed, right in your browser. Or send us a note and we will walk you through it.

Or book a walkthrough by email